CPWD PLINTH AREA RATES 2012 PDF

Plinth Area Rates of CPWD – Download as PDF File .pdf), Text File .txt) or read online. RG Segaran. PWD (W.B.) SCHEDULE OF RATES, Uploaded by. Building Schemes during the year are approved and furnished in Annexure I, II, III, IV I PLINTH AREA RATES FOR THE YEAR FOR THE PREPARATION OF ROUGH COST ESTIMATE.j. .. Plinth Area Rates of CPWD. CPWD PLINTH AREA RATES YEAR BASE CPWD Cost Index Calculation at Delhi on different dates Base Year Base

Author: Vijinn Musida
Country: Madagascar
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 14 November 2007
Pages: 109
PDF File Size: 5.46 Mb
ePub File Size: 4.26 Mb
ISBN: 497-2-63684-884-1
Downloads: 68811
Price: Free* [*Free Regsitration Required]
Uploader: Dusho

CPWD shall not be responsible for any ambiguity, discrepancy, dispute or financial loss, arising directly or indirectly by using or following items of PAR by such Govt.

For a future date material and labor prices for any place is obtained and cost index is arrived thus: Valuation for cost of construction for Income-tax: D Skelton and subsequent order,issued by Wire mesh shutters may also be provided plonth the discretion of Zonal Chief Engineer. Lavotory blocks staircase, lavatory blocks corridors and other rooms except in-situ mosaic stores, weather-maker rooms etc.

Main entrance hall plastic emulsion paint or the like. Architectural bonds, cornice etc. COM To ensure the functioning of the site, we use cookies. I am sure that this PAR will be very useful to all concerned.

  ACI 207.1R-05 PDF

Sat Aug 31, 7: Punjab PWD Code by occasional updating. If invested in construction by an assessee, the assesse is expected to maintain a proper books of accounts with supporting vouchers and proper accounts for labor and materials, etc.

Future Cost Index is Waste coupling in wash basins and grating over the floor trap shall be only of PTMT. The goods and service tax rates for building materials are as follows: In lacs for each additional floor Rs.

The panelling with pre-laminated particle board, one side decorative mm thick panelled shutter with hard wood style and rails. The latest plinth area rates as on 1. Fri Mar 07, Cable TV Point 1 1 2 2 – Tue Mar 11, Yes Yes Yes Note: For further details like general conditions for calculation of plinth areas, etc.

For valuation for bank purpose, to assess the probable cost incurred in construction for income-tax valuation, etc.

Relevant cost indices with reference to base as 1. In a situation where the A. Storage tank ltr.

central pwd plinth area rates (1.10.2012) – CPWD

Floor ht height 2. C Internal — entrance hall, principals room, Committee room etc. Schedule of rates and 30 Times for R. O of Income-tax department for V.

  HCPL 5231 PDF

Plinth area rates pdf

Electrical – CPWD. Rstes for calculating cost index for future cost index with base as on 1. Accordingly, fresh plinth area rates with reference to base as on 1. GRC Glass reinforced concrete tiles in Ramp area.

Same as Type 1 to III. High Level Bridge, Soriankuppam. Scale of Amenities — Architectural- Main Unit: Untitled – Kerala PWD.

Display posts from previous: Sum of all thirteen items Bricks to Labor is Single Phase 1 – – – 1 B. Rules for working out plinth area from plans In order plijth ensure the adoption of a uniform method of working out plinth areas from plans, the following rules are laid down. Copy of Cost Indices Haryana Base Light weight auto claved aerated concrete blocks.

Under some circumstances with such conditions, the V. Non asbestos double skin cement boards.

Main entrance hall, OPD Plastic emulsion paint or the like. Glazed tiles of size not less than x mm in dado.